At the March 3, 2014 NSV IRWMP Board meeting, the NSV Board adopted the Revised Draft IRWMP, except for pages 4-9 through 4-23 that address the Climate Change Vulnerability Assessment.
After some revisions, the Board adopted the final plan at their April 14, 2014 NSV Board meeting. See the Library Page to download the Adopted FINAL NSV IRWMP (4/14/2014).